DC Rapid EV Charger Installers.

Installing DC Rapid and Ultra-Rapid chargers (50kW to 350kW+) is not a standard electrical job; it is a major infrastructure project. Whether you are upgrading a petrol forecourt, electrifying a retail park, or building a dedicated public charging hub, you need a specialist high-voltage contractor.

These projects require complex civil engineering, extensive DNO (Distribution Network Operator) negotiations, and often the installation of brand-new grid substations.

Our network of certified commercial EV specialists provides end-to-end, turnkey solutions – taking your rapid charging project from initial feasibility and grid connection right through to commissioning and payment software integration.

DC Rapid EV Chargers Quick Links:

Monetise Your Car Park

DC Rapid chargers offer an incredible ROI for high-footfall locations. By offering 15-to-30-minute charge times, you not only generate direct revenue through contactless kW billing, but you also drastically increase customer dwell time for your on-site retail and hospitality businesses.

Browse Approved DC Rapid EV Charger Installers

Loading...
Showing nationwide results. Use the location filter above to find verified experts in your specific town or city.
Author Image

Jellywatt Renewables Ltd

Author Image

Sygma

Author Image

Perth City Electric Ltd

Author Image

AMETS Electrical Solutions

Author Image

Story Electrical

Author Image

Wooldale Renewables

Author Image

JPH Electricals Group Ltd

Author Image

Jason M Allan Electrician

Author Image

Premier Renewables Wiltshire

Author Image

Influx Electrical

Author Image

Eco Greenenergy Solutions Group Ltd

Author Image

Modern Energy and Electrical Services

Author Image

Electrotec Power Solutions Ltd

Author Image

Optic Energy Ltd

Author Image

Electrical Testing London

Author Image

LJM Solutions

Author Image

Voltco

Author Image

DB Electrical

Author Image

Glo Renewables

Author Image

Eco Energy Install

Author Image

Greentech Renewables

Author Image

A Greener Alternative

Author Image

EV Enabled

Author Image

Swaye Electrical Services Ltd

Author Image

MCR Electrical Services

Author Image

O’Grady Electrical Engineering Limited

Author Image

Anglia Safety Electrical & Testing Ltd

Author Image

The EV Charging Company

Author Image

EV Chargers Installation

Author Image

Perfect Sense Energy

Author Image

Atlantic Renewables

Author Image

Glasgow EV Chargers

Author Image

M & E Contrax Ltd

Author Image

McNally Renewables

Author Image

Now EV

Author Image

Faithful Spark Electricians

Author Image

Certified Renewable Solutions Ltd

Author Image

AK Power

Author Image

Eastbourne Energy

Author Image

T W R Lighting & Electrical Ltd

Author Image

D.Holt Electrical Servicers Ltd

Author Image

ACG Renewables

Author Image

Helios Electrical & Solar

Author Image

JME Energy

Author Image

Jmg renewables

Author Image

JD Allen Engineering

Author Image

Electrical & Renewable Installations

Author Image

Honest energies LTD

Author Image

Hill View Renewables

Author Image

Ideal Electrical Solutions

Author Image

R-EV Power

Author Image

Send It Solar Ltd

Author Image

DB Energy Group Ltd

Author Image

Greenfields Heat and Power Ltd

Author Image

DJB Electrical Services

Author Image

Fit Solar

Author Image

Ubitec

Author Image

Bright Sky Solar Ltd

Author Image

VoltPoint Energy

Author Image

DEV Installations

Turnkey Infrastructure: What a Rapid Specialist Delivers

When dealing with high-voltage DC power, you cannot hire separate companies for groundworks, cabling, and software. You need a contractor who manages the entire lifecycle of the project.

Typical Installation Costs for DC Rapid Hubs (2026)

Installing high-voltage public charging is a major capital expenditure. The hardware alone is a fraction of the total cost; grid connections and civil engineering will dictate your final budget.

ComponentEstimated CostNotes & Variables
50kW DC Charger (Hardware)£15,000 - £25,000Standard rapid charging. Adds ~100 miles of range in 35 minutes.
150kW - 350kW+ Ultra-Rapid (Hardware)£35,000 - £75,000+Forecourt standard. Requires liquid-cooled cables and massive grid capacity.
New Grid Connection / Substation£15,000 - £250,000+Highly variable. Dictated entirely by your DNO and distance to the nearest high-voltage network.
Civil Engineering & Groundworks£5,000 - £30,000+Trenching, concrete plinths, bay painting, and impact protection barriers.

DC Rapid Charger Installation Process

Because DC Rapid installations involve the local power grid, the timeline from feasibility to going live usually takes between 3 to 9 months.

  1. Feasibility & DNO Application Your contractor will assess your site and submit a formal application to the DNO to determine if the local grid can support a rapid charger, or if a costly upgrade is required.
  2. Design & Procurement Once power is secured, the civil engineers will map out trenching routes, parking bay layouts, and order the heavy-duty DC hardware.
  3. Civils & Electrical Installation Trenches are dug, heavy armoured cables are laid, and the concrete mounting plinths are poured before the units are craned into place and wired in.
  4. Commissioning & Software Go-Live The chargers are tested under load, payment terminals are activated, and the hub is published to national EV roaming maps so drivers can find you.

Frequently Asked Questions: DC Rapid Charging

In many cases, no. Under Permitted Development Rights, most commercial properties can install EV charging infrastructure without full planning permission. However, because DC Rapid units are large and often require a new substation or visible electrical housing, you should check with your local authority if the installation is near a highway or in a conservation area. Your installer will handle this feasibility check.

The difference is purely down to power output.

  • Rapid Chargers: Typically 50kW. They provide a significant charge (80%) in about 30–45 minutes.
  • Ultra-Rapid Chargers: Range from 150kW to 350kW+. These can add 100 miles of range in under 10 minutes, provided the vehicle’s battery can accept that speed. Most modern public “hubs” now focus on 150kW+ units.

Yes. Under the Public Charge Point Regulations 2023, all new public charge points with a power rating of 8kW and above (and all existing rapid points over 50kW) must offer ad-hoc contactless payment. This ensures that any driver can use your charger without needing to download a specific app or sign up for a subscription.

Unlike AC chargers, DC units have complex internal power modules and often use liquid-cooled cables to manage heat. They require at least one major professional service per year. Most commercial operators opt for a Service Level Agreement (SLA) that includes 24/7 remote monitoring, as the government now mandates 99% reliability across a network’s rapid chargers.

Rarely. A standard commercial building supply is usually not large enough to support multiple high-power DC units alongside existing operations. Most DC Rapid projects require a new grid connection and a dedicated transformer/substation. Your specialist contractor will manage the “Point of Connection” application with the DNO (Distribution Network Operator) to secure this power.

Through your Charge Point Management Software (CSMS). You can set dynamic pricing based on the time of day, offer discounted rates for your own fleet or staff, and set a higher “public rate” for guests. The total price must be clearly displayed to the consumer in pence per kilowatt-hour (p/kWh) before they start charging.

Our Vetting Process

We rigorously vet all our DC rapid charger installers to ensure they hold the specialized high-voltage accreditations required for advanced commercial systems. This guarantees a safe, grid-compliant installation and ensures your site is fully eligible for OZEV commercial grants and smart tariff integration.

Build Your Rapid Charging Hub.

Secure your grid connection and turn your car park into a revenue-generating asset. Find an accredited high-voltage DC Rapid installer today to begin your site feasibility study.

Scroll to Top

Featured Installer Enquiry

Find Your Expert